What to Plan For Before You Start Ripping Out Cabinets
A kitchen renovation is a substantial investment – and one that demands planning before any of your old cabinets come out. At The Kitchen People, we are obsessive planners, and that’s why our projects run seamlessly. We aim for the absolute minimum disruption to your home life while your new kitchen is designed, manufactured, and installed. The process begins with our initial consultation at our Millwater Design Centre.

Setting Your Budget – With a Contingency
Every renovation guide will tell you to set a budget. But it’s wise to build in a contingency on top of it. Once walls and floors are opened up, it’s common to discover things you didn’t know about beforehand. There can be outdated wiring, old plumbing in awkward spots, or timber framing that needs attention. But if you’ve put aside a contingency of an extra 10–15% on top of your budget, it means they’re just an adjustment, not a crisis.

Is Your Kitchen Payout Changing?
The layout is the decision that has the biggest effect on both cost and timeline. Renovations that keep the sink, benches and appliances roughly where they already are are faster, simpler, and cheaper, because the plumbing and wiring stay put, and there’s less for the sub-trades like plumbers, electricians, and flooring to do. A change to the layout, if it affects the structure of your house, could also trigger a building consent, which will add extra cost and time.
Neither approach is better, but knowing which way you’re going before you start will save a lot of back-and-forth.

Check What Needs Consent
So we just touched on consents. Not every kitchen renovation needs a building consent, but some do, for example, if you’re removing a load-bearing wall, relocating plumbing, or making significant electrical changes. If consent is necessary, it pays to build that into your planning from day one rather than discovering it partway through.

Plan for Living Without a Kitchen
It’s easy to focus entirely on the finished result and forget about the weeks in between. A mid-range renovation typically takes several weeks from demolition to completion, and it might even be longer if there’s structural work or consents haven’t been planned for. While you’re kitchenless, setting up a temporary cooking place makes the in-between period less painful. It’s worth budgeting for a few more takeaways than usual, too.



Choose Finishes That Will Still Look Right in Ten Years
The kitchen that looks sharpest on the day it’s finished isn’t always the one that ages best. A benchtop or cabinetry finish that wears well under daily use will still be doing its job long after a cheaper option has started to show it.
What’s more, design trends evolve, so what’s cool now might have moved on by the time you’re due for your next renovation — so it pays to make your big-ticket items like your cabinets and benchtop classic, and save the trendy details for cheap to update things like handles, paint, or splashback tiles.
Talk to us first
We want your newly renovated kitchen to be a source of pride and satisfaction that rewards you every single day for years to come. When you work with us, we will help you set a realistic and affordable budget, flag anything that might need consent, sequence the trades properly, make sure the important decisions are made in the right order, and ensure the installation happens seamlessly.
Book a consultation with our team and let’s turn your kitchen renovation plans into reality.